Azalea House, TW13 4GB, PulsaCoil A-Class

We have created this Thermacoil Installation Case Study page to enable you to see before and after images of a typical installation. Azalea House, TW13 4GB, PulsaCoil A-Class Replacement Case Study features a residential development in Bedfont Lane, Feltham and is made up of 72 high quality one and two bedroom apartments, situated in Feltham Town Centre. Mr H is just one example of the many customers we work for in this area.

Azalea House, TW13 4GB, PulsaCoil A-Class Replacement Case Study

Mr H called The Plumbing Group Limited when a tenant informed him that he was having trouble getting hot water from his PulsaCoil A-Class. Our engineers headed out to the property to take a look at the boiler and find the problem. It was quickly found that the unit had a split cylinder. When this is the case, the boiler becomes beyond economical repair and must be replaced as opposed to repaired. Luckily, our engineers were able to perform a temporary fix for the tenants to give them hot water until the replacement boiler arrived.

Mr H chose a Fabdec ThermaCoil as his replacement boiler as opposed to the PulsaCoil PCS. This is because the Thermacoil is a far less complicated system. The ThermaCoil runs off of a single mechanical blending valve while the PulsaCoil has many more parts to it. This includes a Printed Circuit Board, Pump, Sensors and Relays. For the user of the system it is no different but for long term maintenance it is much simpler.

The installation was carried out in under four hours and the old unit was removed and ethically disposed of. Mr H was also shown how to maintain and operate his new unit.

The new ThermaCoil comes with a 10 Year Manufacturers cylinder warranty, for further details visit www.thermacoil.co.uk