Bloomfield Court, E10 5NY, PulsaCoil A-Class

We have created this Thermacoil Installation Case Study page to enable you to see before and after images of a typical installation. Miss P contacted us when she was without hot water. Bloomfield Court, E10 5NY, PulsaCoil A-Class Replacement Case Study features a residential development in Bloomfield Road, London and is made up of 34 high quality one, two and three bedroom apartments, that are located adjacent to Coronation Gardens and the Matchroom Stadium. Miss P is just one of many customers that we work for in this area.

Bloomfield Court, E10 5NY, PulsaCoil A-Class Replacement Case Study

Miss P called The Plumbing Group Limited when she began experiencing problems with her PulsaCoil A Class and needed the assistance of an engineer.

Once our engineers had arrived, they completed a number of checks on the boiler to find out what the problem was. It was quickly discovered that the unit had a split in the cylinder and was leaking. When this is the case the unit can no longer be repaired as it is not economically possible. Consequently, this means that the unit has to be replaced with a new one. Our engineer was able to perform a temporary repair for Miss P. This was to give her hot water until her replacement arrived for installation.

Miss P chose a Fabdec ThermaCoil as her replacement boiler as opposed to the PulsaCoil PCS. This is because the Thermacoil is a far less complicated system. The ThermaCoil runs off of a single mechanical blending valve while the PulsaCoil has many more parts to it. This includes a Printed Circuit Board, Pump, Sensors and Relays. For the user of the system it is no different but for long term maintenance it is much simpler.

The installation was carried out in under four hours and the old unit was removed and ethically disposed of. Miss P was also shown how to maintain and operate her new boiler.

The new ThermaCoil comes with a 10 Year Manufacturers cylinder warranty, for further details visit www.thermacoil.co.uk