Commercial Road, E14 7LB, PulsaCoil A-Class

We have created this Thermacoil Installation Case Study page to enable you to see before and after images of a typical installation. Commercial Road, E14 7LB, PulsaCoil A-Class Replacement Case Study features a residential development consisting of 15 high quality one and two bedroom apartments, that are located near the A13 and Rotherhithe tunnel. Mr P is just one of the many customers that we work for in this building.

Commercial Road, E14 7LB, PulsaCoil A-Class Replacement Case Study

Mr P called The Plumbing Group Limited when he began experiencing problems with his PulsaCoil A-Class; it was no longer heating up. Our engineer headed out to the property to take a look at the boiler. He carried out a number of tests and found that the cylinder was split and leaking. As a result the unit is deemed beyond economical repair and has to be replaced. Our engineer performed a temporary repair for Mr P to give him hot water until his replacement arrived.

Mr P opted for a ThermaCoil replacement option over the new PulsaCoil PCS. There are many parts to a PulsaCoil, for example; a Printed Circuit Board, Pump, Sensors and Relays. This differs from the ThermaCoil which runs off of a single mechanical blending valve. This makes the Thermacoil a far less complicated system than the PulsaCoil, especially with regards to long term maintenance.

The engineers removed the old unit, making sure to dispose of it correctly, and installed the new Thermacoil. Mr P was shown how to maintain and operate his new unit once this was done. The whole process was complete in under four hours.

The new ThermaCoil comes with a 10 Year Manufacturers cylinder warranty, for further details visit www.thermacoil.co.uk